It really looks good. Everything went very well this afternoon except that the guy that did the work- and did the measuring for the amount of concrete I needed, can't add. It wasn't 3/4 of a yard of mud I neeeded because when we dumped that much in the hole, it didn't begin to fill it up!
It took 2 1/4 yards of mud to fill the hole! Seems Jack got distracted while he was measuring and doing the math and only told me how much I needed for 1 portion of the job. Fortunately it wasn't a problem- except for the added expense- to go pick up the 2nd load of concrete just a few blocks away.
I'm really pleased with the way this job has turned out.